Mostly dry . . .

Today Walter and Wad got the sheathing on the second half of the barn roof. Tomorrow they’ll get the tar paper and metal on. That leaves the trim and ridge cap for a future day.

This entry was posted in House2 Construction. Bookmark the permalink.

Leave a Reply