Windows and a door

Terry’s brother Walt came and spent a couple days getting the east end wall for the loft framed in with two windows and a door.  Once it’s sided it will keep the wind and rain out.  The joists for the loft deck are up and some of the pressure treated 2″x6″ decking is in place, though not fastened down.

Terry’s very excited about his new shop and is out every day doing something to the building.  This morning the chickens took their early morning sabbatical on his new workbench and he had to go shoo them off before they decorated his bench with bird detritus.  This problem will go away once the siding is all on and the birds can be kept out.

This entry was posted in House2 Construction. Bookmark the permalink.

Leave a Reply