Closing in on the target

I stopped in at our local supply place and ante’d up for fireclay, concrete and sand.  Wad’s picking it up on Friday after work.  I stopped in at the recycle yard to get a tall 40 gallon hot water heater to use the water tank as the container for the riser insulation.   No joy.  I’ll try again on Friday.

This entry was posted in House2 Construction. Bookmark the permalink.

Leave a Reply