Small steps

We are finished rerouting the water, including everything covered in good insulation for freezing temps.  We’ve also rerun the power so it doesn’t go through the middle of the sun porch footprint.  I’ve still got to move the phone line, but it’s still progress.

Terry got the rubble trench foundation drain end buried in a gravel filled hole.  He still has to backfill the top, but that’s cosmetic.

I’ve got sewing tomorrow, but will start excavation of the corner of the living for reblocking if Sunday’s weather allows.